Clark Freeport Zone Utilities

power distribution

Residential and General Service Rates

A. Residential

 
First 100 KWH
P0.85/KWH
Excess KWH
P0.80/KWH
Minimum Charge:
P10.20 for the first 12 KWH

Power Factor Adjustment (For General Service)
A Power Factor Adjustment (PFA) charge during any billing period shall be added in the power bill if theP.F. is less than 85% lagging. However, for P.F. above 90% up to 95%, a bonus is granted to the customer provided that a P.F. above 95% shall be considered as 95% in the computation of the P.F. adjustment bonus. The P.F. adjustment shall be computed as follows:

 
Charge/Bonus
=
Total Basic Demand x[ (S.P.F/P.F. ) -1 ]
 
Where S.P.F.
=
standard power factor, 85%, for penalty and 90% for bonus
P.F.
=
actual power factor
 
The ratio S.P.F./P.F. shall be rounded to four (4) decimal places.

B. Small General Service

 
 
GS-1
GS-2
GS-3
GS-4
 
Connected
2,500
2,501 to
5,001 to
10,000
 
Load in Watts
or less
5,000
10,000 up
 
 
First
50
90
160
350
P0.98/KWH
Next
150
260
440
900
P0.88/KWH
Next
300
550
1,200
3,250
P0.83/KWH
Excess KWH
 
 
 
 
P0.81/KWH
 
Minimum Charge: For Customers NOT using high Momentary Draw machines like transformer-type welders and X-ray equipment, P11.76/month on consumption of12 KWH or less shall apply. Otherwise, P11.76 PLUS an additional charge of P10.00/KVA

C. Large General Service
For Large General Service customers who guarantee a monthly billing demand of not less than 30 KWH, the following shall apply:

 
Demand Change: P10.00 per KW of billing demand  
 
Energy Change: First 200 hours use of billing demand
P0.83/KWH
  Next 200 hours use of billing demand
P0.80/KWH
  Next 100 hours use of billing demand
P0.78/KWH
  Excess KWH
P0.76/KWH
Minimum Change: P800.00/month  

 

Industrial Service Rates

A. Small Industrial Service (below 40 KWH)

 
Demand Change: P10.00 per KW of billing demand  
 
Energy Change: First 200 hours use of billing demand
P0.88/KWH
  Excess KWH
P0.78/KWH
 
Minimum Change: P800.00/month  

 

Power Factor Adjustment (For Industrial Service)
A Power Factor Adjustment (PFA) charge during any billing period shall be added in the power bill if theP.F. is less than 85% lagging. However, for P.F.> above 90% up to 95%, a bonus is granted to the customer provided that a P.F. above 95% shall be considered as 95% in the computation of the P.F. adjustment bonus. The P.F. adjustment shall be computed as follows:

 
Charge/Bonus
=
Total Basic Demand x[ (S.P.F/P.F. ) -1 ]
 
Where S.P.F.
=
standard power factor, 85%, for penalty and 90% for bonus
P.F.
=
actual power factor
 
The ratio S.P.F./P.F. shall be rounded to four (4) decimal places.

A. Large Industrial Service (40 KWH and over)

 
Demand Change: P10.00 per KW of billing demand
 
 
Energy Change: First 200 hours use of billing demand
P0.78/KWH
 
Next 200 hours use of billing demand
P0.77/KWH
 
Next 100 hours use of billing demand
P0.76/KWH
 
Excess KWH
P0.75/KWH
 
Minimum Change: P800.00/month
 

 

telecommunications

 
 
Installation Charge
Monthly Rate
 
Residential
P 2,469.51
P 479.51
Business
P 3,557.02
P 822.02
(inclusive of one(1) month advance rental and deposit for unit)

 
Internet Access
Type of account Free Hours
Start-up Fee
Monthly Fee
Excess per Minute
Plan A 10 Hours
P 300.00
P 300.00
P 1.25
Plan B 20 Hours
P 600.00
P 600.00
P 1.00
Plan C 30 Hours
P 900.00
P 900.00
P 0.75
Plan D 100 Hours
P 2,000.00
P 2,000.00
 
Dedicated Dial-Up Unlimited
P 10,000.00
P 10,000.00
 
Leased Line 64 KBPS
 
P 55,000.00
P 55,000.00
 
Leased Line 128 KBPS
 
P 90,000.00
P 90,000.00
 


water

Note: Hotel and Golf Courses are subject to 15% surcharge on total billing. The standing charges for meters larger than 2i available upon request. Strong effluents (e.g. High Biological Oxygen Demand) may be subject to additional treatment charge to be agreed upon with individual lessee or locator.

 
Size/Type of Use Min. Charge
 
0-10 cu m 11-20 cu m 21-30 cu m 31 cum m up
 
Residential
1/2" 15mm
P 75.00
P8.10
P8.55
P9.00
3/4" 20mm
P 120.00
P8.10
P8.55
P9.00
1" 25mm
P 240.00
P8.10
P8.55
P9.00
1 1/2"
40mm
P 500.00
P8.10
P8.55
P9.00
2" 50mm
P 1,500.00
P8.10
P8.55
P9.00
 
Industrial/Commercial/Areas
1/2" 15mm
P 150.00
P16.15
P17.10
P18.05
3/4" 20mm
P 240.00
P16.15
P17.10
P18.05
1" 25mm
P 480.00
P16.15
P17.10
P18.05
1 1/2"
40mm
P 1,200.00
P16.15
P17.10
P18.05
2" 50mm
P 3,000.00
P16.15
P17.10
P18.05

 

Contact : Ms. Arlene D. Aniciete
Berthaphil Compound J. Abad Santos Ave., Clark Freeport Zone, Pampanga, Philippines 2009

Tel : (6345) 599 5312 / 5313 • Fax : (6345) 499 5314  email: arlene@berthaphil.com

Links: * Clark Center * Clark Freeport Zone * Clark International Airport

U.S. Contact : Peter Herman (917) 734-7163 email: berthaphil@aol.com